South West Biogas Plant

project-Willand Biogas LLP

This 1.3MW CHP, 600KW Biogas Boiler with 1,000 M3 Biomethane to Grid connection with available 2,500 M3 connection to grid.

Using heat for pre treatment hydrolysis provides;
Phase 1-Farm based feedstocks-45,000 tonnes
Phase 2- Waste-Poultry litter, food waste
55,000 tonnes
Phase 3-BML plant 85,000 tonnes
All digestate back to grow crops for animals and plant

Related Posts