project-Willand Biogas LLP

South West Biogas Plant

This 1.3MW CHP, 600KW Biogas Boiler with 1,000 M3 Biomethane to Grid connection with available 2,500 M3 connection to grid.

Using heat for pre treatment hydrolysis provides;
Phase 1-Farm based feedstocks-45,000 tonnes
Phase 2- Waste-Poultry litter, food waste
55,000 tonnes
Phase 3-BML plant 85,000 tonnes
All digestate back to grow crops for animals and plant